Water & Sanitary Sewer

Utilities design is another aspect of design that is present on virtually every one of our projects. We have experience with everything from 1” water service lines to 12” water mains, sanitary sewer pump stations, and force mains. On occasion, we have recommended phased construction with temporary utilities to keep businesses open and minimize the impact on users of the property instead of the more severe damages that a wholesale construction might otherwise inflict.

Our Water & Sanitary Sewer Services

  • Utilities Design
  • Water Main Design
  • Sewer Design
  • Construction Administration
  • Sewer Main Extension

Our Water & Sanitary Sewer Projects

  • Town of Nashville Water and Sewer, Nashville, NC – Responsible for Water and Sewer Design and Construction Inspection. Project included water and sewer main extensions and 6 sewage lift stations.
  • Town of Middlesex – CDBG Water and Sewer – Responsible for Water and Sewer Design, Construction Administration and Construction Inspection. Project included water and sewer main extensions and sewage lift station design.
  • 12-inch Watermain and Sewage Station and Force Main to serve Town Public Works Operational Facility – Town of Wake Forest – Responsible for design, contract documents and construction inspection of the 12-inch watermain and the sewage pumping station and force main.